Fechar a janelaImpressão

Ficha do projecto para P-MZ-FA0-005

Título do Projecto / Programa
ENERGY REFORM AND ACCESS PROGRAM
Breve Descrição
GoM's goal for the energy sector is to provide the various economic sectors adequate energy, at minimum cost and in a sustainable manner, so as to reduce poverty and enhance economic growth. To attain the sector goal, the country will secure energy supply through an appropriate diversity of economically competitive and reliable sources, with emphasis on the development of indigenous energy sources for both the domestic and export markets. The global goal of ERAP is to contribute to the reduction of Green House Gases (GHGs) emission through replacement of supply from diesel fuel generation by renewable energy supply, in particular by solar photovoltaic power. The Program objective is to increase access to modern energy through capital investment and Private Sector Participation (PSP) in the energy sector. To this end, the Program will supply electricity to about 400,000 people by 2007; enhance service delivery through connection of 300 schools and health facilities in the project area; and mobilize private sector investment of at least US$7.4 million under the concession arrangements. Furthermore, the Program will assist in creating an enabling environment for PSP in the energy sector through reform and capacity building in the sector institutions. The components of ERAP comprise A: Power Sector Reform, B: Grid-based Electrification, C: Independent Grid Rural Electrification, D: Renewable Energy Promotion, E: Institutional Development and Capacity Building; and F: Audit Services. The Program will support the expansion of the electricity distribution grid using appropriate design standards and innovative delivery approaches; promote NRE development; restructure the energy sector by establishing separate Transmission and Distribution Companies from the existing EdM; and establishment of an independent Regulator. It will also support measures to strengthen the capacity of energy sector institutions to advance the efficient operation of the sector and implement private sector led electrification.
Doador
BAD
Agência Doadora / Agência ONU
Banco Africano de Desenvolvimento/Fundo Africano de Desenvolvimento
Código da Instituçao Beneficiária dos Fundos (UGB)
  • Electricidade de Moçambique
Mapa
Map

Informações sobre o Projecto

Situação do projecto
Concluído
Código Moçambicano do Projecto
Código da Fonte de Recursos (FR)
256BAD/FAD
Início - Conclusão Real
2005-01-24 / 2010-12-30
Início - Conclusão Planificado
2003-10-01 / 2010-12-30
Data da Assinatura do MdE/contrato de financiamento
2004-04-22 00:00:00 UTC
Implementação Nacional/Regional
Nacional 
Tipo de Implementação
Multilateral 
Informação de contacto
Mr. Babu Ram | +216 71 333511 | b.ram@afdb.org 
Ligação do projecto a Internet
 
Comentários
ADB Finance ADF: UA9,02 TAF: UA1,97 Other Sources of Finance World Bank: UA30,61 GEF: UA2,21 NDF: UA4,36 GoM: UA7,45 TOTAL: UA55,6  

Informação de Financiamento

Modalidade de Ajuda
Projecto de Investimento
Moeda Utilizada
BUA
Tipo de Financiamento
Empréstimo
Inscrito no OE/Fora do OE
No Orçamento do Estado
No/Fora da CUT
Fora da CUT
Totais de financiamento
Desembolsos
10.553.764 EUR
Compromissos
10.553.764 EUR
Fundos não desembolsos
0 EUR
Financiamento Histórico
Desembolsos
0 EUR
Compromissos
0 EUR
Financiamento 2007
Desembolsos
1.561.566 EUR
Compromissos
11.007.053 EUR
Desembolosos 1º Trimestre
51.382 EUR
Desembolosos 2º Trimestre
7.819 EUR
Desembolosos 3º Trimestre
1.496.780 EUR
Desembolosos 4º Trimestre
5.585 EUR
Financiamento 2008
Desembolsos
418.968 EUR
Compromissos
0 EUR
Desembolosos 1º Trimestre
334.328 EUR
Desembolosos 2º Trimestre
0 EUR
Desembolosos 3º Trimestre
0 EUR
Desembolosos 4º Trimestre
84.640 EUR
Financiamento 2009
Desembolsos
4.158.724 EUR
Compromissos
0 EUR
Desembolosos 1º Trimestre
0 EUR
Desembolosos 2º Trimestre
6.020 EUR
Desembolosos 3º Trimestre
247.396 EUR
Desembolosos 4º Trimestre
3.905.308 EUR
Financiamento 2010
Desembolsos
2.586.947 EUR
Compromissos
0 EUR
Desembolosos 1º Trimestre
5.371 EUR
Desembolosos 2º Trimestre
1.549.683 EUR
Desembolosos 3º Trimestre
0 EUR
Desembolosos 4º Trimestre
1.031.893 EUR
Financiamento 2011
Desembolsos
953.271 EUR
Compromissos
0 EUR
Desembolosos 1º Trimestre
0 EUR
Desembolosos 2º Trimestre
5.203 EUR
Desembolosos 3º Trimestre
2.100 EUR
Desembolosos 4º Trimestre
945.968 EUR
Previsões de Financiamentos 2011
Desembolsos
2.001.402 EUR
Compromissos
0 EUR
Previsões de Financiamentos 2012
Desembolsos
23.350 EUR
Compromissos
0 EUR

Classificação

Canal de Entrega
  • EdM
  • ME
Sector DAC
100.0%
23000 Energia: Produção E Aprovisionamento
23040 Transmissão E Distribuição Eléctrica
ODM
  • Pobreza
  • Ambiente
Provincías Focais
Nacional